Prefab Workshop Buildings for Plant Hire Co
RequirementsSolutionBenefitsProductRelated ProductsRelated Case Studies

Prefabricated Workshop Buildings for Plant Hire Co

Requirements

A national Plant Hire company had a requirement for multiple prefab workshop buildings when they acquired a nationwide heavy machinery rental firm. With the sites of the newly acquired business being closed completely, the Plant Hire client needed to amalgamate the additional operational activity onto their existing sites, and quickly.

Solution

The client considered permanent buildings but very soon realized it would be far too slow and expensive given the volume of buildings they needed. Researching alternative options, the client found aluminum framed industrial buildings or temporary buildings as they’re often referred as.

Temporary buildings have an incredibly fast installation method of usually less than a week as they are modular in design and can be anchored down to existing concrete surfaces without needing any foundations.  Not only does this build method achieve major time savings but also financial as there is minimal labor, equipment, hours, architectural and engineering input required.   Additionally, most businesses are able to continue working at full capacity during the build programs, ensuring no slow-down in operational activity or production.

Despite the amazingly fast and simple installation the HTS buildings are strong and durable and custom manufactured for each site and project, ensuring a minimum guaranteed life-span of 10 years – although many existing buildings have been in situ and operational for over 20 years!

Competing with three other providers HTS TENTIQ won the business by demonstrating how their in-house design and manufacturing capability and capacity could provide the right buildings at the right time and engineered to meet their site-specific structural stability requirements – in terms of snow loads and wind speeds.   The prefab workshop building for Immingham was designed, manufactured and supplied to the following specification:

  • 15.00m wide x 30.00 long x 5.20m eave height
  • Thermo insulated roof
  • Composite wall panels
  • 2 x personnel doors
  • 3 x roller shutter doors
  • External gutter system and down-pipes
  • Built onto existing concrete surface
  • Site specific structural calculations
  • Build time – 5 days

Benefits

After experiencing the fast turnaround and installation of this first prefab workshop building, coupled with the functionality and durability once the building was operational, the client realized they had found the perfect solution for the ongoing nationwide integration of the newly acquired rental company. The second site followed quickly with 10.00m x 20.00m x 6.20m insulated workshop and there are 2 more buildings/sites scheduled for early 2019 with more in the pipeline for later in the year.

The speed and ease of creating the additional space has enabled the client to quickly distribute the additional work on the relevant sites and fully capitalize on the acquisition of the new firm.

Type

Insulated Buildings

Size

15.00m x 30.00m x 5.20m

Roof Design

Thermo Insulated

Product used in this case study:

Insulated Buildings

Create your own industrial structure with our quick & easy Configurator Tool

Our configurator tool allows you to design your structure to suit your needs. Design your ideal structure and see how it will look in less than 3 minutes! Receive an estimate and copy of your configuration.

Related Case Studies

Looking for something else?